Managing the periods when the unit is furthest from its design point
The flyer below is the printable A4 version. Use the buttons above to download it or the request form.
Panel operators, shift supervisors, operations engineers and turnaround coordinators involved in unit start-up, shutdown and rate changes
Transient operations account for a small fraction of running hours and a large share of serious incidents. This course looks at what is physically different about a unit at start-up, shutdown, rate change and emergency depressuring: thermal stress, water and air ingress, level control at low rates, trips that behave differently, and procedures written for a plant that has since changed. Participants review one of their own start-up procedures step by step and work through three transient scenarios on the site's own trends.
Transient-operation incidents and their common causes · start-up sequence: air-freeing, purging, leak testing, inventory and warm-up · thermal and mechanical limits on equipment · trip and override management during start-up · procedure review of a participants' start-up procedure
Planned shutdown, decontamination and hand-over to maintenance · emergency shutdown and depressuring · rate changes, feed changes and turndown · pre-start-up safety review and restart after a trip · three transient scenarios on the site's trends · quiz and certificate
OSHA 29 CFR 1910.119(f) / (g)CCPS Guidelines for Safe Process Operations and MaintenanceCCPS Conduct of OperationsISA-18.2API 521 (depressuring)Send a short brief — plant, service of interest and what you need to achieve — and a Cerasus engineer will respond with a proposed scope and next steps.
Prefer email or phone? sales@cerasus.ai · +974 5506 2743