Philosophy, rationalisation workshop and performance monitoring
The flyer below is the printable A4 version. Use the buttons above to download it or the request form.
Control and instrument engineers, console operators and shift supervisors, alarm-management champions
Nuisance alarms are a symptom; the disease is an alarm system nobody owns. The course walks the ISA-18.2 lifecycle from philosophy to audit, then runs a real rationalisation workshop on the participants' own alarm list so they leave with a documented method, a priority matrix and the first rationalised loops.
Alarm-related incidents · ISA-18.2 lifecycle · philosophy and priority matrix · alarm database and documentation · rationalisation method
Rationalisation workshop on participants' alarm list · KPIs: rate, floods, standing alarms · state-based and dynamic alarming · HMI and ISA-101 principles · monitoring with ProcessVision · MOC for alarms
ANSI/ISA-18.2IEC 62682EEMUA 191ISA-101Send a short brief — plant, service of interest and what you need to achieve — and a Cerasus engineer will respond with a proposed scope and next steps.
Prefer email or phone? sales@cerasus.ai · +974 5506 2743